![IMG_8121.jpg](https://static.wixstatic.com/media/082f60_6847d96edf9a4a1c8f90ca8e3f5d9e93~mv2.jpg/v1/fill/w_980,h_303,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/082f60_6847d96edf9a4a1c8f90ca8e3f5d9e93~mv2.jpg)
Our Work
Read up on some of our latest projects.
![MicrosoftTeams-image (1).png](https://static.wixstatic.com/media/082f60_2d36d6fc76ec4ff0b1e04a9391e3d7a1~mv2.png/v1/fill/w_378,h_283,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/MicrosoftTeams-image%20(1).png)
Amazon
Various distribution and sortation centres throughout the UK
We work very closely as an approved vendor of Amazon, installing, maintaining and compliance reporting to Amazons throughout the UK
Marshall (Building Contractors) LTD
Kingsgate Shopping Centre
On this project we were contracted to install the M&E services to there new entertainment complex.
![0_IMG_2832.jpg](https://static.wixstatic.com/media/082f60_fe3c33c9a7c04937bfb8e48eeca807ea~mv2.jpg/v1/fill/w_377,h_283,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/0_IMG_2832.jpg)
![MicrosoftTeams-image (6).png](https://static.wixstatic.com/media/082f60_344a3d52f0e84f4ea8c4dab4ee95ed23~mv2.png/v1/fill/w_377,h_283,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/MicrosoftTeams-image%20(6).png)
Ikea
New lighting upgrade
This project, we were tasked with upgrading the existing warehouse lighting to new Tecton busbar LED lighting system.
Salesforce Tower
London - New low level power installation to office
Due to water damage caused by a sprinkler activation on a recently installed office refurb, we were asked to isolate the existing, and strip out the existing water damaged underfloor services, then supply and install all new services.
![MicrosoftTeams-image.png](https://static.wixstatic.com/media/082f60_893f4301f70d4344baace0f6e70ff8a3~mv2.png/v1/fill/w_376,h_282,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/MicrosoftTeams-image.png)
![PHOTO-2023-11-24-06-59-45.jpg](https://static.wixstatic.com/media/456d1f_e64a4a8df3cc4b3b85767341a82cea91~mv2.jpg/v1/fill/w_377,h_283,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/PHOTO-2023-11-24-06-59-45.jpg)
Paxton Access
Technology Centre
New production facility & office fitout.
This project has seen us installing new power, containment and lighting system to the new production facility which will has seen us installing a full system throughout, complete with new Containment, Power & Data, Lighting, Bussbar and Distribution.
Lidl
New store - Sheffield
On this project we have be commissioned to undertake the incoming power and external lighting installation to the new store ready for the fit out contractors, with this project we have designed and installed the external lighting installation, installed new the new main switch ready for the new power coming in to the building and also installing lightning protection and main earth nest.
![MicrosoftTeams-image (5).png](https://static.wixstatic.com/media/082f60_3e90e48b3e674e919683e32c3c0f6c37~mv2.png/v1/fill/w_212,h_282,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/MicrosoftTeams-image%20(5).png)
![MicrosoftTeams-image (3).png](https://static.wixstatic.com/media/082f60_e3b2045302de449b9f5172e9c011e35f~mv2.png/v1/fill/w_377,h_283,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/MicrosoftTeams-image%20(3).png)
Creating Spaces Group
Outdoor living
For this client we have installed power and lighting to many garden pods across the UK
Creating Spaces Group
Indoor living
For this client we have installed new power and lighting to new kitchens throughout Yorkshire.
![MicrosoftTeams-image (3).png](https://static.wixstatic.com/media/082f60_e3b2045302de449b9f5172e9c011e35f~mv2.png/v1/fill/w_376,h_282,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/MicrosoftTeams-image%20(3).png)